Meeting Minutes - January 13, 2009
Meeting – January 13, 2009
Report Meeting
Add section about what the project is supposed to do and the components
Make Work Breakdown Structure more horizon
On sensors section put headings
Parallax PING Sensor (say where acquired)
Sensors figure: Large and Small, explain saturation
Arduino
Motor Controller
In Scheduling
Refer to first figure
Refer to Gantt Chart
Division of labour
Potentiometer
Move section on specs for microcontroller
Intelligence Algorithm
In Gantt Chart
What is meant by construction?
Software integration? Intelligence algorithm?
Put software integration right after component integration
Add caption about completion
Show a second Gantt Chart in Meeting with up-to-date
Problem and risk management
Aside
—-
Meeting Minutes - January 7, 2009
Present:
Jonathan Mash
Mike Studli
Liliane Barbour
Agenda
Discussion:
Liliane is in charge of contacting Dr. Hashtrudi-Zaad to set-up a meeting time
All team members are to finalize their course schedule in order to plan arranged meeting times
Task assignments were arranged to optimize the blueprint writting procedure
Control board and motor control board interfacing standard was discussed and agreed upon
Meeting Minutes - Nov 20, 2008
Meeting Minutes - Nov 14, 2008
Sensors
Putting blinders on sensors
Need more cure for sensors to each have their own area.
Need to test thermal sensor → see if can be used to differentiate between objects
Will order more PIRs later in case some get damaged
Motor
How much force on gears? Don’t want to break
If use gears can use a smaller stepper motor
Algorithm: ramp start and stop
Spline curve → so can start acceleration with zero slope at beginning and zero slope at end
Electrical
Heat sinks
Do we need an enclosure?
Test on bigger TVs
Microcontroller
Ordering plan
Buy pre-fab controller, and purchase PING, etc.
When see how much money left, then buy parts for custom controller and PIR sensors
PERF board
Need to put PCB boards in the budget
What we need now
For next week
Budget
Test thermal sensors
Test volume
Meeting Minutes - October 30th, 2008
Present:
Dr. Hastrudi-Zaad
Jonathan Mash
Mike Studli
Liliane Barbour
Agenda
Discussion:
Project:
Check devices but we may need budget approval first
Contact: Steve Humphrey
Items and testing devices
Use volt meter and oscilloscope to test
Particular bench set-up if we need special equipment
Research proximity sensors
Discussed next meeting date
* field trip next Thursday so the following Thursday November 13th
Deliverables for the next meeting
Deliverables for November 13th Meeting:
Look at sensors
Crude plan of what we want to do
Present all options (uC, fpga, etc)
Up-dated budget
Be ready to start ordering
Back to top