Meeting Minutes - January 13, 2009

Meeting – January 13, 2009 Report Meeting

  • Add section about what the project is supposed to do and the components
  • Make Work Breakdown Structure more horizon
    • * Add caption about what numbers represent
    • * Can use abbreviations of Names
  • On sensors section put headings
  • Parallax PING Sensor (say where acquired)
  • Sensors figure: Large and Small, explain saturation
    • * Add section about extra waveforms
    • * Leave out section about oscillations
  • Arduino
    • * Show the specs and shrink the rest
    • * Put full specs in the appendix
  • Motor Controller
    • * Justify purchase
    • * More specifications
    • * Required specs of the H-Bridge IC
    • * Need more specifications in general
  • In Scheduling
    • * Refer to first figure
    • * Refer to Gantt Chart
  • Division of labour
    • * Investigate new motor and design new motor drive, speced the motor
  • Potentiometer
    • * Add to budget
  • Move section on specs for microcontroller
  • Intelligence Algorithm
    • * Issues with PIR sensors
    • * Different scenarios
    • * Filters
    • * Take information from proposal
  • In Gantt Chart
    • * What is meant by construction?
    • * Software integration? Intelligence algorithm?
    • * Put software integration right after component integration
    • * Add caption about completion
    • * Show a second Gantt Chart in Meeting with up-to-date
  • Problem and risk management
    • * Risk level → low, medium , high

Aside

  • Look into getting a piece of plexiglass that lets infrared

Meeting Minutes - January 7, 2009

Present:

  • Jonathan Mash
  • Mike Studli
  • Liliane Barbour

Agenda

  • Blueprint paper - task assignment

Discussion:

  • Liliane is in charge of contacting Dr. Hashtrudi-Zaad to set-up a meeting time
  • All team members are to finalize their course schedule in order to plan arranged meeting times
  • Task assignments were arranged to optimize the blueprint writting procedure
  • Control board and motor control board interfacing standard was discussed and agreed upon


Meeting Minutes - Nov 20, 2008



Meeting Minutes - Nov 14, 2008

Sensors

  • Putting blinders on sensors
    • Problem that it might not detect close objects.
  • Need more cure for sensors to each have their own area.
  • Need to test thermal sensor → see if can be used to differentiate between objects
  • Will order more PIRs later in case some get damaged

Motor

  • How much force on gears? Don’t want to break
  • If use gears can use a smaller stepper motor
  • Algorithm: ramp start and stop
  • Spline curve → so can start acceleration with zero slope at beginning and zero slope at end
    • Spline toolbox in MATLAB

Electrical

  • Heat sinks
  • Do we need an enclosure?
  • Test on bigger TVs

Microcontroller

  • Need a lot of analog ports → 8?
  • Serial output

Ordering plan

  • Buy pre-fab controller, and purchase PING, etc.
  • When see how much money left, then buy parts for custom controller and PIR sensors
  • PERF board
  • Need to put PCB boards in the budget

What we need now

  • Excel table with minimum costs in a budget
  • Possible other budget with custom controller, etc.

For next week

  • Budget
  • Test thermal sensors
  • Test volume
    • Look for evaluation board for controller
    • Ease of programming
    • Power supply
    • memory


Meeting Minutes - October 30th, 2008

Present:

  • Dr. Hastrudi-Zaad
  • Jonathan Mash
  • Mike Studli
  • Liliane Barbour

Agenda

  • Proposal paper

Discussion:

  • Reviewed proposal report
  • Looked at web-site
  • Clean front end of web-site
  • Have some password protection option

Project:

  • Check devices but we may need budget approval first
  • Contact: Steve Humphrey
  • Items and testing devices
  • Use volt meter and oscilloscope to test
  • Particular bench set-up if we need special equipment
  • Research proximity sensors
  • Discussed next meeting date
  • * field trip next Thursday so the following Thursday November 13th

Deliverables for the next meeting

  • Deliverables for November 13th Meeting:
  • Look at sensors
  • Crude plan of what we want to do
  • Present all options (uC, fpga, etc)
  • Up-dated budget
  • Be ready to start ordering