| ====== Submission Information ====== | ====== Submission Information ====== | ||
| - | //Date:// January 14, 2009. | + | // |
| //Submitted By:// **Group 8** | //Submitted By:// **Group 8** | ||
| * Liliane Barbour | * Liliane Barbour | ||
| * Jonathan Mash | * Jonathan Mash | ||
| - | * Michael Studli | + | * Michael Studli |
| //Faculty Supervisor:// | //Faculty Supervisor:// | ||
| Line 14: | Line 13: | ||
| ===== Download ===== | ===== Download ===== | ||
| + | {{: | ||
| {{: | {{: | ||
| - | {{: | ||
| ====== EXECUTIVE SUMMARY ====== | ====== EXECUTIVE SUMMARY ====== | ||
| Line 39: | Line 38: | ||
| The project is composed of a three-part framework: a sensing system to determine the position of viewers, a controller to compute the ideal position of the TV, and a drive system to accurately rotate the TV to a previously calculated position. See Figure 1 for a graphical representation. | The project is composed of a three-part framework: a sensing system to determine the position of viewers, a controller to compute the ideal position of the TV, and a drive system to accurately rotate the TV to a previously calculated position. See Figure 1 for a graphical representation. | ||
| - | {{: | + | {{ : |
| Figure 1: System level overview | Figure 1: System level overview | ||
| Line 45: | Line 44: | ||
| ===== WORK BREAKDOWN STRUCTURE ===== | ===== WORK BREAKDOWN STRUCTURE ===== | ||
| - | {{:wbs.jpg|}} | + | {{ :wbs.jpg }} |
| Figure 2: Work Breakdown Structure | Figure 2: Work Breakdown Structure | ||
| Line 117: | Line 116: | ||
| Table 1: Summary of Current Budget | Table 1: Summary of Current Budget | ||
| - | {{: | + | {{ : |
| ====== PROBLEMS AND RISK MITIGATION ====== | ====== PROBLEMS AND RISK MITIGATION ====== | ||
| - | {{: | + | {{ : |
| ====== CONCLUSIONS ====== | ====== CONCLUSIONS ====== | ||
| Line 139: | Line 138: | ||
| ====== APPENDIX A: PIR SENSOR OUTPUT ====== | ====== APPENDIX A: PIR SENSOR OUTPUT ====== | ||
| - | {{: | + | {{ : |
| Output from a PIR sensor with movement of person from left to right of the field of view. | Output from a PIR sensor with movement of person from left to right of the field of view. | ||
| Line 147: | Line 146: | ||
| ====== APPENDIX B: DETAILED BUDGET ====== | ====== APPENDIX B: DETAILED BUDGET ====== | ||
| - | {{: | + | |
| + | {{ : | ||
| ====== APPENDIX C: GANTT CHART ====== | ====== APPENDIX C: GANTT CHART ====== | ||
| - | {{: | + | |
| + | {{ : | ||
| ====== APPENDIX D: DUAL FULL-BRIDGE DRIVER ====== | ====== APPENDIX D: DUAL FULL-BRIDGE DRIVER ====== | ||
| Source: | Source: | ||
| - | {{: | + | {{ : |
| - | + | {{ : | |
| - | {{: | + | {{ : |
| - | + | ||
| - | {{: | + | |
| Line 165: | Line 164: | ||
| Source: (7) | Source: (7) | ||
| - | {{: | + | {{ : |
| - | + | ||
| - | {{: | + | |
| - | + | ||
| - | {{: | + | |
| Line 175: | Line 170: | ||
| Source: (8) | Source: (8) | ||
| - | {{: | + | {{ : |